Leuchtturm1917
Monthly Planner and Notebook 2024 Softcover
Monthly Planner and Notebook 2024 Softcover
Couldn't load pickup availability
The monthly planner with notebook is a practical combination of a concise yet clear planner and full-fledged notebook. This is a valuable accessory in a hectic urban life, for keeping a well-structured overview of appointments, yet having enough room to write down all the plans and creative ideas that accumulate over the course of a day. Moreover, the softcover makes it light to carry around. Available in the following formats: Composition (B5) or Paperback (B6+).
The front section shows an entire month condensed onto one double-page spread, on which the weeks appear horizontally beneath each other. The back section features the notebook with lots of pages for writing down notes and visions. The popular dotted ruling is excellent for both writing and drawing. In the Composition format, the day fields are provided with lines; in the Paperback format, the day fields are blank with no lines.
Details:
Format:
Note: Pencil in photo is only for size reference and is not included
Share
